Herein we are telling you about the construction of the comfort-class residential complex "Shchaslyvyi Grand" in Sofiyivska Borshchahivka.

In the second section, preparations are underway to sign the main notarized contracts, and the process of connecting to the gas and electricity grids is in progress.

In the third section, finishing work is underway (97% complete), along with landscaping around the building, installation of a playground, planting of greenery, and preparations for commissioning.

In the fourth section, window installation is underway (95% complete), as is the installation of water supply and sewer systems (60% complete), facade work (90% complete), roofing work, preparation for plastering and screeding, and door installation.

In the fifth section, concrete work has been completed. The construction of walls and partitions is underway (40% complete). Installation of windows, preparations for exterior work, and roofing work have begun.

In the sixth section, concrete work is underway on the basement level.

In the seventh section, work is underway on the foundation slab and preparations for the monolithic concrete work.

In the underground parking lot, the installation of fire protection systems in Section 5 is underway, and preparations are being made for commissioning.