REPORT ON WORKS AT THE RC “CRYSTAL AVENUE” CONSTRUCTION SITE

13.05.2021

In the business class residential complex “Crystal Avenue” in Petropavlivska Borshchahivka, the construction of individual houses is nearing completion, while in other buildings the planned works are underway. Read the details in our report.

In the second building (11-A, Oksamytova Street) plastering works have been completed. Masters are making the floor cap on the 15th floor, communications - on 16-17 floors. Facade works are also underway.

In the third building  (1-A, Kryshtaleva Street) installation of radiators (5th floor) is taking place. Installation of boilers is completed. Connection to networks (gas, electricity) continues. Finishing works have started on the ground floor.

In the fourth building (1, Kryshtaleva Street) plumbing works continue.

In the fifth building (1-B, Kryshtaleva Street) the foundation plate will be covered very soon. The tower crane is also being installed here.

To choose the optimal apartment layout, see how the construction is going, or learn about profitable investment in the residential complex "Crystal Avenue", visit the sales department, located in:  14 – A, Soborna street, Petropavlivska Borshchahivka. Or call:  044 499 25 67; 067 663 89 35.