Progress in construction RC "Crystal Avenue", August 2021

First phase (9-A, Oksamytova Street)

• the house is commissioned;

• all apartments are sold and occupied;

• the arrangement of the adjacent territory around the house has been partially completed;

Second phase (11-A, Oksamytova Street)

• installation of apartment and vestibule doors has finished;

• facade and finishing works, installation of elevators proceed.

• finishing works of common areas are underway.

Third phase (1-A, Kryshtaleva Street)

• improvement of the adjacent territory continues (laying of paving slabs and a playground installation);

• installation of balcony railings in apartments is coming to an end.

Fourth phase (1, Kryshtaleva Street)

• installation of window frames is completed;

• plastering works are underway (on the 10th floor);

• heating installation is underway (5-6 floors ready);

• floor cap work has started (2-3 floors).

Fifth phase (1-B, Kryshtaleva Street)

• the floor slab of the third floor is being prepared.