The first stage (9-A Oksamytova St.)
• the house is commissioned.
The second stage (11-A Oksamytova St.)
• the house is commissioned.
The third stage (1-A Kryshtaleva str.)
• the house is commissioned.
Fourth stage (1 Kryshtaleva str.)
• gas supply connection completed
• connection of electricity supply on a permanent basis and conclusion of major contracts are in progress.
The fifth stage (1-B Kryshtaleva str.)
• facade works, interior and electrical works, final cleaning of common areas and staircases have been completed;
• finishing works in the lobby, facade arrangement on the 1st floor (80% complete), outdoor lighting and irrigation installation, landscaping and preparation for planting, testing of all building systems, preparation for commissioning are ongoing;
• landscaping works are continuing in the last part of the underground parking lot, floor installation and fire safety system installation have begun.
WORKING HOURS OF SALES DEPARTMENTS DURING THE HOLIDAYS
From December 31 to January 11 inclusive, the sales and accounting departments will be closed.
30.12.2025
2025 RESULTS FROM “NOVABUDOVA” COMPANY
As a tradition, at the end of the year we summarize our achievements.
30.12.2025
CONSTRUCTION OF THE RESIDENTIAL COMPLEX "CRYSTAL AVENUE": MONTHLY DIGEST (DECEMBER 2025)
Herein we are telling you about the construction progress of the Crystal Avenue residential complex in Petropavlivska Borshchahivka.
30.12.2025